Phuket airport expansion is the plan most likely to change trips to Bang Tao, but it is years away: a new international terminal phase was reported for 2032. The Kathu to Patong expressway and tunnel is targeted for October 2031, and a new airport link road for 2028. All three are plans, not finished roads, and dates have moved before.
This guide sets out each project, its status in late 2026 and the source behind each date. Our Bang Tao real estate guide describes the area as it is today; this one looks ahead.
In this guide
What Is Planned for Bang Tao Access Between 2026 and 2032?
Three projects matter most for trips to and from Bang Tao: more terminal space at the airport, a road link under the hills between Kathu and Patong, and a short new road to the airport entrance.
| Project | Status (Oct 2026) | Target date | Source |
|---|---|---|---|
| Phuket airport, Phase 2 international terminal | Construction reported to start in 2027 | 2032 | Pattaya Mail, 12 Oct 2026 (news) |
| Phuket Expressway Phase 1, Kathu to Patong, with tunnel | Revised plan with the Transport Ministry; Cabinet consideration expected around December 2026 | Opening targeted for October 2031 | Government spokeswoman via The Nation, 16 Sep 2026 |
| Phuket Expressway Phase 2, Mueang Mai to Ko Kaeo to Kathu | In detailed design | Also targeted for October 2031 | Reports of 13 to 16 Sep 2026 |
| New highway, Ban Mueang Mai to the airport junction | Construction was due to start in August 2025 | Opening expected within 2028 | Department of Highways via InfoQuest, 25 Jun 2025 (news) |
The dates are targets set by the agencies or reported in the news. None of these projects is open yet.

Where Does the Phuket Airport Expansion Stand?
Airports of Thailand describes Phuket International Airport as two passenger buildings, international and domestic, open 24 hours. Its airport page gives no expansion timetable.
The most recent timeline we found is in the news. Pattaya Mail reported on 12 October 2026 that the airport was designed for about 12.5 million passengers a year but now handles more than 17 million. The report said construction of Phase 2 of the international terminal is due to begin next year and finish in 2032, adding about 5.5 million passengers of capacity.
Treat 2032 as a reported date for the Phuket airport expansion until Airports of Thailand publishes it. Earlier reports gave other years, which is one reason to plan around today’s airport rather than tomorrow’s.
What it means day to day: until the new terminal opens, peak-season arrivals can mean queues at the airport. If you meet guests or arrive for a viewing between December and February, allow extra time at the terminal and book transfers ahead.
The Phuket airport expansion is about terminal space, not the roads outside. Even when the new phase opens, the drive from the airport to Bang Tao will use the same local roads until the road projects below are built. Our Phuket airport to Bang Tao guide covers the ways to make the trip.
What Is the Kathu to Patong Expressway and Tunnel?
It is a planned road link through the hills between Kathu and Patong, led by the Expressway Authority of Thailand (EXAT). EXAT’s project website describes two phases: Phase 1, Kathu to Patong, of 3.98 km, and Phase 2, Mueang Mai to Ko Kaeo to Kathu, of 30.62 km. It says the project is meant to relieve Thepkrasattri Road (Highway 402) and Phra Barami Road.
The latest plan, reported in mid-September 2026, has Phase 1 going to Cabinet around December 2026, construction from October 2027 for about four years, and opening in October 2031. The Nation’s report of 16 September 2026 quotes the government’s deputy spokeswoman giving the same target.
The route runs from Phra Metta Road in Patong through a 1.85 km tunnel under Khao Nak Kerd to Phra Barami Road in Kathu. EXAT expects it to cut the Kathu to Patong journey from about 30 minutes to about five.
For Bang Tao, the tunnel matters mainly for trips south to Patong and Phuket Town. Phase 2, from Mueang Mai near the airport towards Kathu, would matter more for airport trips, but it is still in design.
What Is the New Road to the Airport Junction?
It is a short new highway from Ban Mueang Mai to the junction at the airport entrance. InfoQuest reported on 25 June 2025 that the Department of Highways planned a 1.950 km, four-lane road branching from Route 4027, with an interchange and a viaduct over mangrove.
The same report said construction could start in August 2025, with opening expected within 2028. We found no 2026 progress report, so ask locally how far the work has gone when you visit.

Why Have the Dates Changed Before?
Large projects change shape as they go through approvals. The expressway is the clearest example. EXAT’s project website says a private-investment tender for Phase 1 drew no proposals. Later, the tunnel’s planned diameter was cut from about 17 m to about 14 m, and the opening target moved to 2031.
A target date is the agency’s plan at the time it was stated. Cabinet decisions, land acquisition, contracts and construction can each move it.
What Do These Plans Mean If You Buy in Bang Tao?
Buy for the access that exists today, not for the Phuket airport expansion or a road that has yet to be built. The Trees Residence’s homepage gives about 30 minutes from Phuket Airport to the project in Bangtao. If a new road shortens a trip later, treat it as a bonus rather than a reason to pay more now.
Three practical steps help:
- Drive your common routes at busy times: the airport, Phuket Town and Patong.
- Ask the seller which of these projects they mention in their marketing, and for the source and date behind each claim.
- Recheck the status before you sign. A Cabinet decision on the expressway was expected around December 2026.
If you rent your home out, faster links can widen the area guests are willing to stay in, but there is no figure for that effect. Our things to do in Bang Tao guide shows what guests can already reach nearby.
Frequently Asked Questions
When will the Phuket airport expansion be finished?
Pattaya Mail reported on 12 October 2026 that the Phase 2 international terminal is due for completion in 2032, with construction starting in 2027. We found no Airports of Thailand page confirming the date.
When will the Patong tunnel open?
The target for Phuket Expressway Phase 1, Kathu to Patong, is October 2031, according to reports in mid-September 2026. Cabinet consideration was expected around December 2026.
Will the expressway make it faster to reach Bang Tao from the airport?
Not Phase 1, which links Kathu and Patong. Phase 2, from Mueang Mai near the airport towards Kathu, is still in detailed design.
How long does it take to get from Phuket airport to Bang Tao today?
The Trees Residence homepage gives about 30 minutes to the project. Times vary with traffic.
Is there a light rail or tram to Bang Tao?
We found no update on a Phuket light rail or tram between August and October 2026, so this guide makes no claim about one.
Final Takeaway
The Phuket airport expansion, the Patong tunnel and the new airport link road are all planned for 2028 to 2032, and all are still plans. Buy for the access you can test today and recheck each project before you sign.
If you want to know how these plans affect a purchase in Bang Tao, ask an advisor on WhatsApp.
Information note: Project dates and details come from agency statements and news reports on the dates shown. They are targets and can change. This article is general information, not investment advice, and makes no forecast of property values.
Image note: Images in this article are AI-assisted illustrations. They do not show the actual design of any road, tunnel or terminal.